[{"data":1,"prerenderedAt":93},["ShallowReactive",2],{"tool-signoff-cost-calculator":3},{"id":4,"title":5,"author":6,"authorImage":7,"body":8,"description":76,"draft":77,"extension":78,"kind":79,"meta":80,"navigation":81,"ogImage":82,"path":83,"publishedAt":84,"seo":85,"stem":86,"tags":87,"toolSlug":90,"updatedAt":91,"__hash__":92},"insights\u002Finsights\u002Fsignoff-cost-calculator.md","What is slow sign-off costing your agency?","Alex Coull","\u002Fimages\u002Finsights\u002Fauthor-alex-coull.jpg",{"type":9,"value":10,"toc":70},"minimark",[11,16,20,23,46,49,53,56],[12,13,15],"h2",{"id":14},"how-this-works","How this works",[17,18,19],"p",{},"Slow sign-off rarely shows up as a line on an invoice, so it's easy to miss. But every day a\nfinished deliverable sits waiting on a client's yes is a day that capacity can't be reinvested,\nreinvoiced, or rolled into the next job. Multiply that across a year of projects and the drag gets\nreal.",[17,21,22],{},"The calculator above uses three numbers you already know:",[24,25,26,34,40],"ul",{},[27,28,29,33],"li",{},[30,31,32],"strong",{},"Projects per month:"," roughly how many deliverables go out for client review.",[27,35,36,39],{},[30,37,38],{},"Average days waiting for approval:"," the gap between \"sent for review\" and \"signed off\".",[27,41,42,45],{},[30,43,44],{},"Your day rate:"," what a billable day of your team's time is worth.",[17,47,48],{},"It multiplies those out into an annual estimate of billable capacity stuck in approval limbo. The\nnumbers are all yours: we don't assume anything on your behalf, so the figure reflects your agency's actual workflow\nrather than an industry average.",[12,50,52],{"id":51},"what-to-do-with-the-number","What to do with the number",[17,54,55],{},"Treat it as a ceiling, not a bill. You'll never reclaim all of it, and you wouldn't want to, because\nsome review time is healthy. But if the figure made you wince, the lever that moves it most is wait\ntime. Shave a couple of days off each approval and the annual drag drops quickly.",[17,57,58,59,64,65,69],{},"If you'd like the deeper version of this, our two guides walk through why approvals become the\nbottleneck and the specific habits that shorten them: ",[60,61,63],"a",{"href":62},"\u002Finsights\u002Fhidden-cost-of-slow-signoff","The hidden cost of slow sign-off for a design\nagency"," and ",[60,66,68],{"href":67},"\u002Finsights\u002Fget-clients-to-approve-faster","How to get clients to approve designs faster\n(without nagging)",".",{"title":71,"searchDepth":72,"depth":72,"links":73},"",2,[74,75],{"id":14,"depth":72,"text":15},{"id":51,"depth":72,"text":52},"A quick calculator that turns your own numbers (projects, wait time, and day rate) into the annual cost of slow client approvals.",false,"md","tool",{},true,"\u002Fimages\u002Finsights\u002Fsignoff-calculator.jpg","\u002Finsights\u002Fsignoff-cost-calculator","2026-07-01",{"title":5,"description":76},"insights\u002Fsignoff-cost-calculator",[88,89],"Calculator","Agency growth","signoff-cost-calculator",null,"i7u1USc0MvAStBNevELjASaveMZwZ5CiDPV6_3CYy8I",1794956299368]